Sepahan Cement

Home Projects Project Details

    • Consulting and performing basic and detailed design services of electrical systems and control of cement transfer equipment from existing cement silos to mixer system, cement and slag mixer system department, slag and cement transfer equipment from line 3 mill to existing cement silos, cement transfer from dual silos New to the new loader, the new loader department includes two packing machines and manual and automatic bag loaders, two palletizing machines in the old and new loader. Also control and implementation of detailed plans of other contractors, along with excellent and resident supervision over the construction, installation and commissioning of electrical equipment of departments and other equipment mentioned above.

      Start of the project |: 91/10/18

      Contract duration: 15 months